Builder Warranty Documentation
Pre-delivery baselines and turnover records designed to preserve construction conditions before occupancy, punch-list closeout, and later review.
- Structured walkthrough documentation
- Timestamped, geo-referenced records when capture method supports it
- Organized archive and summary report
- Evidence integrity statement
Each record is matched to the site, access needs, capture method, and required continuity controls.